Monday, November 10, 2008
Update! Episode 4!
Sorry, I have no pictures in this post, I'll really try to post some tomorrow. Anyway, we now have all the ductwork and wiring done. The sheetrock is all done with the exception of the bathrooms and window sills, etc. Tomorrow, we move the two remaining windows out of the old part of the house and into the new. We'll also buy another external door and put that in place in our bedroom. We're holding off on the actual deck where this door leads to, but eventually that'll get done too. They have yet to blow in the attic insulation, but since we are opening the old house into the new, that needs to get done ASAP. Plumbing is all done with the exception of connecting the two shower/tub drains with the plumbing in the basement. Dean ran the new gas line in the wall and needs to run it in the basement to where our new range will be. We have to insulate the basement knee-wall and around the rim board. I'm hoping Dean orders the hardwood flooring tomorrow, but we'll see. We also need to look into building porches/decks off the new doors. There's so many "little" things that also need to get done, but I'm not listing them all here.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment